CITY OF TUCKER ACKNOWLEDGE RECEIPT OF ADDENDUM #1 Publish Date: October 24, 2025 ITB #2025-015 GATEWAY SIGN CONSTRUCTION Please complete this page and include this page only in bid submittal. I hereby acknowledge receipt of the supplement pertaining to the above referenced bid. COMPANY NAME: CONTACT PERSON: ADDRESS: CITY: STATE: PHONE: FAX: EMAIL ADDRESS: SIGNATURE DATE 1 ZIP: ITB #2025-015 ADDENDUM #1 This addendum contains: 1. Responses to all received questions. 2. Image of City of Tucker Modified Seal for use on gateway signs. 1 QUESTION Could you please confirm if a signage-only bid (with landscape explicitly excluded) is acceptable? 2 Could you please provide a list of the contractors who are bidding on this project? I would like to submit pricing for the signage portion directly to them. 3 Reference: LS-100 – Layout Plan through LS-103 (5 / 10) The drawings note “10 Existing Signs to be Removed.” Please clarify what types of signs these are (monument, directional, post-mounted, etc.). ANSWER No portion of this bid shall be excluded. The bidder shall completely deliver the project as prescribed by the plans and bid documents. A contractor may elect to utilize a sub-contractor, but shall be identified in the proposal. City of Tucker does not require contractors to provide an Intent to Bid, therefore, we do not know who will submit a bid. A list of firms that attended the non-mandatory pre-bid meeting is published on the City of Tucker website for this solicitation. However, attendance at the meeting does not oblige the firms to submit a bid. Signs previously installed were removed by the City of Tucker Public Works. Any signs removed or damaged for construction shall be replaced with a new sign of like kind. The City strongly encourages a site visit to observe the location. This is a lump sum bid; as such, all prices shall be included. Provide sign sizes and photos or location details if available. 4 5 Confirm whether these are for removal only or if any new signs are to be installed in their place. Is the proposed sign location in the GDOT right-of-way? If so, has the City already obtained approval from GDOT (i.e. permits, encroachment agreements)? Will any GDOT permits be required to be procured by Contractor? The sign is 100% on City property. There is some sod being installed on GDOT right of way. The City will coordinate with GDOT as needed. No.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,282 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today