CITY OF TUCKER ACKNOWLEDGE RECEIPT OF ADDENDUM #2 Publish Date: May 26, 2026 ITB #2026-013 SR 410/US 78 @ CR 9476/MOUNTAIN IND BLVD ROADWAY IMPROVEMENT PROJECT PI 0017399 Please complete this page and include this page only in bid submittal. I hereby acknowledge receipt of the supplement pertaining to the above referenced bid. COMPANY NAME: CONTACT PERSON: ADDRESS: CITY: STATE: PHONE: FAX: EMAIL ADDRESS: SIGNATURE DATE 1 ZIP: ITB #2026-013 ADDENDUM #2 This addendum contains: 1. Responses to Round 2 Questions 2. Revised Cost Proposal. Calculation Correction made to pay items 362, 363. and 364. No changes were made to line items or quantities. This Bid Schedule must be used for Bid Submittal. Separate Excel file name: PI 0017399 MIB - PS&E Bid Shedule-Addendum#2 3. Plan Updates: a. Sheet 01-0001 b. Sheet 03-0001 c. Sheet 23-0040 d. Sheet 31-0001 4. End Area Volume Report 5. Utility Schedule – Ga Power 6. Utility Schedule – Atlanta Gas QUESTION Will the City of Tucker be providing any earthwork, UAS reports, and/or Geotech reports? Will the City of Tucker provide a plan holders list for this project? ANSWER Earthwork calculations and utility schedules are included in this addendum. Geotechnical reports were not required for the project. The City does not require Bid Intents and does not otherwise maintain a plan holders list. 3 Cant the City of Tucker provide a pay item for CONCRETE SIDE BARRIER, TP 2-SA? 4 As per the Bid Schedule: • Line Item 439-0020 – PLAIN PC CONC PVMT, CL 3 CONC, 9 INCH THK • Line Item 439-0024 – PLAIN PC CONC PVMT, CL 3 CONC, 11 INCH THK The bid schedule specifies Class 3 Concrete for the above items; however, the Typical Sections (Sheets 12 through 15) indicate Class 1 Concrete. Could you please confirm which concrete class should Concrete side barrier TP 2-SA is not applicable. The plans for the wall envelope have been revised according to TP 2-S standards and are included in this addendum. Class 1 concrete should be used on the exit ramps. 1 2 2 ITB #2026-013 ADDENDUM #2 be used for these pavement sections and bid items? 5 Please confirm the required method for eradication/removal of the existing striping. Should it be performed by hydro blasting, sand blasting, or simple grinding? Striping eradication should be done by hydroblasting. 6 Will a Shuttle Buggy or MTV be required for all paving operations? No. 7 As per Plan 38-0008, the 24-inch curb and gutter are specified as Class A Concrete.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,282 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today