CITY OF TUCKER ACKNOWLEDGE RECEIPT OF ADDENDUM #1 Publish Date: May 13, 2026 ITB #2026-013 SR 410/US 78 @ CR 9476/MOUNTAIN IND BLVD ROADWAY IMPROVEMENT PROJECT PI 0017399 Please complete this page and include this page only in bid submittal. I hereby acknowledge receipt of the supplement pertaining to the above referenced bid. COMPANY NAME: CONTACT PERSON: ADDRESS: CITY: STATE: PHONE: FAX: EMAIL ADDRESS: SIGNATURE DATE 1 ZIP: ITB #2026-013 ADDENDUM #1 This addendum contains: 1. Responses to Round 1 Questions 2. Form of Required GDOT Work Class Qualifications to be submitted with bid 3. Revised plan sheets – Quantity 8 4. Revised Cost Proposal Form (Bid Schedule) – Separate Excel File. Required for Bid Submittal QUESTION I noticed that the bid schedule calls for (3) strain pole, tp IV, but I was only able to locate a single lane assignment assembly (2 poles) in the sign plans at STA 217+75.44. Is this an error on the bid schedule? Can the city confirm whether the asphalt index will be applicable to this project in accordance with GDOT specifications? Could the City please provide UAS for the project? ANSWER The correct number for TP IV Strain Poles is 2. The Bid Schedule and plans have been corrected. 4 Is it possible to receive the bid schedule in Excel format? 5 Revised Cost Proposal (Bid Schedule) required for Bid Submittal is provided with this Addendum in a separate Excel File. Any lighting fixtures not already listed in the plans will need to be submitted to GDOT for approval. I am reaching out in regards to bid SR 410/ US 78 @ CR 9476/ Mountain Industrial Blvd Roadway Improvement Project. Can you please confirm if there would be an opportunity to submit lighting fixtures for review and preapproval? Or will proposed fixtures be evaluated and approved after bid opening? The Bid Items for the Overhead Over sign trusses have been added to the bid tab. signage trusses at the two Off-Ramp exits is missing, please add those bid items. The quantity for Main Temp Silt The quantity for Maintenance of Silt Fence Tp A Fence is typically 50% of the has been corrected in the bid tab. 1 2 3 6 7 Asphalt Index is applicable to the project. UAS is posted on G.P.A.S. web portal. 2 ITB #2026-013 ADDENDUM #1 8 installation number, the bid qty seems to be off by a factor of 10. Please review. There is a Bid Item for 15” storm drain pipe, but it is not in the Summary of Quantities or on the plans. Please confirm.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,508 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today