01-22-003 Science Building Corridor Flooring Replacement Bid

ILWaubonsee Community Collegecommunity collegeConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
01-22-003
Open Date
Jan 12, 2022
Close Date
Jan 20, 2022
Status
Awarded

Description

A mandatory pre-bid meeting is scheduled on Wednesday, January 12, 2022 at 1:00 p.m. Meet in the north lobby of the Science Building, Sugar Grove Campus. Lump Sum Bids are due on or before January 20, 2022 at 11:00 a.m., prevailing time. Bidding documents and addenda may be obtained from BHFX Planroom. Phone: 630-393-0777; Warrenville@bhfx.net. Bids are to be submitted and uploaded electronically on the BHFX Planroom site, www.bhfxplanroom.com. Bidders must be logged in to submit their bids. Bid

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Illinois. 2,285 open bids in Illinois — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Aug 22, 2026 | ID: 76572381

Open Construction Bids in Illinois

ILCityOpenAug 24, 2026
Building Demolition at 1320 18th Avenue
East Moline · #PM-D2026-002
Construction
ILStateOpenAug 24, 2026
Construction Services for ADA State of Good Repair North and South Stations
BidNet Direct - Illinois
Construction
ILCityOpenAug 24, 2026
Demolition at 1234 15th Avenue
East Moline · #PM-D-2026-001
Construction
ILStateOpenAug 24, 2026
PC Concrete C & G R & R, bit concrete surface removal, patching, and overlay
BidNet Direct - Illinois
Construction