SECTION 00800 FIRST AMENDED SUPPLEMENTARY CONDITIONS The following supplements modify, change from or add to the Standard General Conditions of the Construction Contract, EJCDC Document C-700, 2002 Edition. Where any Article of the General Conditions is modified or any Paragraph, Subparagraph or Clause thereof is modified or deleted by these supplements, the unaltered provisions shall remain in effect. ARTICLE 1 - DEFINITIONS AND TERMINOLOGY Add the following sentence to Paragraph 1.01.28 entitled “Notice of Award”: "When requested by OWNER, the Notice of Award may be issued by the ENGINEER." Add the following sentence to Paragraph 1.01.29 entitled “Notice to Proceed”: "When requested by OWNER, the Notice to Proceed may be issued by ENGINEER." Add the following terms after Paragraph 1.01 50: 1.51 ARCHITECT/ENGINEER - The person, firm or corporation named as the ENGINEER in the Agreement. 1.52 Provide - As used in the Project Manual, means to furnish and install, complete and ready for intended use. 1.53 Product - As used in the Project Manual, includes materials, fabrications, systems and equipment. 1.54 Project Manual - The volume of written construction documents, including the Bidding Documents, sample forms, and the Contract Documents, such as the Conditions of the Contract and the Specifications. 1.55 Retainage – The percentage of the Contract Price, retained by Owner from the progress payments to the Contractor for Work performed until the Work is completed. It shall be payable to Contractor in accordance with the Contract Documents. ARTICLE 2 - PRELIMINARY MATTERS Add the following to Paragraph 2.01: "If the Work is to be commenced prior to execution of the Agreement in response to a letter of intent, CONTRACTOR shall, prior to commencement of the Work, submit evidence satisfactory to OWNER that such bonds will be furnished." 05/17 00800-1 15-8083.2 In the first line of Paragraph 2.02. change the term "...ten..." to read: "...six(6)...". Delete Paragraph 2.03. and replace with the following: “The date of commencement of the Work is the date established in a Notice to Proceed.” Add the following to Paragraph 2.05.: “D. CONTRACTOR shall perform no portion of the Work at any time without Contract Documents or, where specified, approved Shop Drawings for such portion of the Work. E.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Florida. 2,353 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today