Bid Number
2025-008
Open Date
--
Close Date
--
Status
Open

Description

CITY OF TUCKER ACKNOWLEDGE RECEIPT OF ADDENDUM #2 ITB #2025-008 RICHARDSON STREET CONSTRUCTION Please include this page only in bid submittal. I hereby acknowledge receipt of the supplement pertaining to the above referenced bid. COMPANY NAME: CONTACT PERSON: ADDRESS: CITY: STATE: PHONE: FAX: EMAIL ADDRESS: SIGNATURE DATE 1 ZIP: ITB #2025-008 ADDENDUM #2 This addendum contains the following: • Response to Questions received • Revised Cost Proposal Form o This is a required bid submittal document and supersedes the Cost Proposal form in the original bid document. 1 QUESTION ANSWER The note on Sheet 15.2 indicates that Yes, the area of the wall that is backfilled does the granite veneer for the gravity not need the veneer. wall is to cover the front, back, and top of the wall. If the wall is backfilled up to the top, is it acceptable to eliminate the veneer on the back side of the wall where it will be fully covered by backfill material? 2 The gravity wall item is currently measured per linear foot (L.F). Given the varying heights of the wall along the terrain, would it be more appropriate to change the unit of measurement from linear feet to cubic yards? Yes, plus use 920 square feet for the quantity. The Cost Proposal form has been adjusted accordingly. The revised form is provided via Addendum #2. 3 I saw there are full depth of road, in plan summary qty saw 12.5 MM, 2" milling qty and tack coat, but in bid schedule saws only patching and 19 MM qty, please check it and give in bid schedule ? The Cost Proposal form has been updated to include 12.5mm asphalt and 2” milling. There is no separate pay item for tack coat. Tack should be included in the unit price for asphalt. The revised form is provided via Addendum #2. 4 Should GC include base course in bid item #7 considering the tons of asphalt and base course are different? Or will the city add a separate item for the base course only? The Cost Proposal has been updated to include graded aggregate base. The revised form is provided via Addendum #2. 2 ITB #2025-008 ADDENDUM #2 5 Who will be in charge of paying for testing? 6 Does the clearing area end at the Right of Way or the Limit of Disturbance? 7 Does GC need a prequalification to install water items? The contractor or subcontractor should be prequalified with the DeKalb County Watershed. 8 Please confirm Georgia Power will provide conduit material and GC should only quote labor/installation. Confirmed.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,282 open bids in Georgia — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 6, 2026 | ID: 42167397

Open Other Bids in Georgia

GACountyOpenSep 28, 2026
Kitchen equipment for Lakeside High School classroom
Bryan County
Other
GACountyOpenSep 28, 2026
Automated Travel & Expense Management and Invoicing Solution
Bryan County
Other
GACountyOpenSep 28, 2026
Provision of Wrecker Services on an Annual Contract
Bryan County
Other