CITY OF TUCKER ACKNOWLEDGE RECEIPT OF ADDENDUM #1 ITB #2025-008 RICHARDSON STREET CONSTRUCTION Please include this page only in bid submittal. I hereby acknowledge receipt of the supplement pertaining to the above referenced bid. COMPANY NAME: CONTACT PERSON: ADDRESS: CITY: STATE: PHONE: FAX: EMAIL ADDRESS: SIGNATURE DATE 1 ZIP: ITB #2025-008 ADDENDUM #1 This addendum contains the addition of Special Condition #10. There will be no separate pay item for compliance with the requirements set forth in Special Condition #10. All other information contained in the original Bid Manual document remains unchanged. SPECIAL CONDITIONS 1. All disturbed or damaged grassing, landscaping beyond the project limits is to match existing conditions. 2. All grass strips between the back of curb and front of sidewalk shall be Bermuda sod. 3. Contractors shall be required to meet all GDOT lane closure requirements, including a Traffic Interpretation Report (TIR). Signage and all other forms of traffic control shall be included in the “TRAFFIC CONTROL” quantity for the project. 4. All cost for landscaping removal, demo of existing pavement/curb & gutter, etc. for the project is to be included in the “DEMOLITION AND DISPOSAL” quantity for the project. 5. Existing Richardson Street from E Ponce de Leon Avenue to Spring View Avenue shall be removed and grassed. 6. Streetlight conduit will be provided by Georgia Power. The conduit installation shall include conduit to be stubbed up at light fixture locations per Georgia Power lighting plan. 7. Coordination and communication shall be had, during the entire length of the construction, between the property owner at 1220 and 1250 Richardson Street, the City, and Contractor. 8. Access to the cell tower located at the end of Spring View Avenue and Richardson Street shall be maintained at all times. 9. Certain item quantities have been increased beyond the values shown on the final plans. This was done intentionally at the discretion of the City. Payment will be made based on the actual work completed. 10. Project Record Drawings, As-Builts and Documents Before Final Acceptance of the Project, the Contractor shall submit to the Project Manager certain records, certifications, etc., which are specified elsewhere in these Contract Documents. Missing, incomplete, or unacceptable items, as determined by the Project Manager or Owner, shall constitute grounds for withholding Final Payment to the Contractor.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,326 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today