ADDENDUM #1 RFP 25-008 2025 LMIG Street Paving This addendum is being issued to address questions submitted on RFP 25-008: 1. What kind of Asphalt Material to you want the Contractor to use for the 1.5 inch Topping? 9.5 mm Type I? 9.5mm Type II? 12.5mm? The material being used is 9.5 mm Type II. 2. Will the Asphalt Material need to meet current GDOT Specifications? Yes, it will need to meet GDOT specs. 3. Will you allow Recycled Asphalt to be used in the new Asphalt Materials in accordance with GDOT Specifications? Or do you want to use Virgin Asphalt Materials? Virgin Asphalt is preferred 4. Will there be a pre-bid meeting for this project? No. This addendum should be signed and returned with your proposal. Failure to do so may result in the proposal being non-responsive. Christy Case Finance Director City of Commerce Company Name __________________________________________________________ Authorized Representative _________________________________________________ Page 1 of 1
Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,515 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today