ADDENDUM #4 RFP 26-007 PURCHASE OF CITY OF COMMERCE, GEORGIA MUNICIPAL FIBER NETWORK ASSETS This addendum is being issued to address questions from the pre-bid meeting for RFP 26-007: 1. Question: What is the city going to do with the customer that is hanging off the end of the network with Accelecom fiber for the last mile? a. Answer: The buyer will need to either negotiate that customer’s connection directly with Accelecom or arrange an alternative method of connectivity. 2. Question: For all of the network, whether we use it or not, is it required that the aerial plant get moved into the communications space and out of the electrical space? a. Answer: Yes. As stated in addendum #2, Commerce expects the buyer to lower the fiber (or remove) within a three year period after purchase. During that three year period, commerce will wavie pole attachment costs to aid the buyer in recoooping any costs. At some point, any fiber located in the electrical space must be relocated to the proper communications space on the pole. Vendors are encouraged to include their plans for addressing this requirement in their proposals. 3. What is the specific footage(s) and location(s) of the aerial plant that was built in the electrical space and not in the communications space? a. Answer: The City of Commerce does not have any documented information on aerial plant footage or locations constructed in the electrical space rather than the communications space. Company Name:___________________________________________________________________ Authorized Representative:___________________________________________________________ Page 1 of 1
Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,278 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today