ADDENDUM #2 RFP 25-005 Fire Station Buildout This addendum is being issued to address questions submitted at the pre-bid meeting on 12/4/24 on RFP 25005: 1. With regards to 4.1 STORAGE ON REAR OF STATION (Bid 1) specification update: EXTERIOR STORAGE/INTERIOR STORAGE/TURNOUT ROOM/UTILITY ROOM will be located at the rear of the building. From left rear corner over 60 feet towards right hand side of building. The rear addition will be divided into 4 separate rooms. The exterior storage room will be located on the far-left corner of the building and shall be 10 feet wide by 12 feet deep. The other three rooms will be 16 feet wide x 12 feet deep. Exterior of rooms will be exact match to material and color to existing building’s exterior. Interior will be exact match to material and color to existing building. Roof of extension shall tie into location suited for strength at purlin located approximately 12 feet high from existing garage area floor. Rear of room shall come down to 10 feet at rear. Gutters shall be installed, and color will be exact match of existing gutters and down spouts shall match the down spouts around the building. All exterior walls and ceiling shall be insulated. This addendum should be signed and returned with your proposal. Failure to do so may result in the proposal being non-responsive. Christy Case Finance Director City of Commerce Company Name __________________________________________________________ Authorized Representative _________________________________________________ Page 1 of 1
Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,492 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today