CITY OF TUCKER ACKNOWLEDGE RECEIPT OF ADDENDUM #2 ITB #2025-002 2025 RESURFACING Please include this completed page in the submittal. I hereby acknowledge receipt of the supplement pertaining to the above referenced bid. COMPANY NAME: CONTACT PERSON: ADDRESS: CITY: STATE: PHONE: FAX: EMAIL ADDRESS: SIGNATURE DATE 1 ZIP: ITB 2025-002 ADDENDUM #2 1 2 3 4 5 QUESTION The Scope of Work information contained in the ITB (page 11 of 22) is not legible, especially when printed out or if you zoom int the pdf. This looks like an excel spreadsheet. Would it be possible for this spreadsheet to be posted in an Addendum You have 25.0mm being placed at a depth of 1.5” Lift on 3 Roads, this lift thickness it too thin for 25.0mm, according to GDOT Specs. The rock in 25.0mm is larger than the 1.5” depth so the rollers will crush it. GDOT Minimum Depth for 25.0mm is 2.5” (See Screenshot below from the current GDOT Specs). Would you please adjust the lift thickness to meet GDOT Specs? For the patching you’re calling for 4” Depth with 25mm. It may be best to use 3.5” Could this be adjusted? Are portable post mounted signs allowed on this project? In Addendum #01 you call for Henderson Rd, Lilburn Stone Mountain Road, and Montreal Industrial Way to receive 19mm topping and 12.5mm binder. Shouldn’t this be other way around? See attached. ANSWER Henderson Road, Lilburn Stone Mountain Road and Montreal Industrial Way was changed to: • Mill 3” • 4” of 25mm patching • 1-3/8” of 12.5 mm binder • 1-3/4” of 19mm topping See Addendum #1. Please use 4” patching depth for this submittal. The depth may be slightly adjusted in the field pending approval of the City Inspector. Three streets require variable message signs. Portable post-mounted signs are acceptable for the remaining streets. Yes.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,336 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today