CITY OF TUCKER ACKNOWLEDGE RECEIPT OF ADDENDUM #1 ITB 2025-001 STORMWATER SYSTEM REPAIR PROJECTS Please print this page and include it in your submittal. I hereby acknowledge receipt of the supplement pertaining to the above referenced bid. COMPANY NAME: CONTACT PERSON: ADDRESS: CITY: STATE: PHONE: FAX: EMAIL ADDRESS: SIGNATURE DATE 1 ZIP: ITB 2025-001 ADDENDUM #1 1 QUESTION The specs do not seem to reference a maintenance or correction period timeframe. Does this project have one? No. ANSWER 2 Is there an engineer’s estimate available for the Stormwater System Repair Project? The City does not disclose project budgets during the solicitation process. 3 The bid tab appears to reference Felt CIPP , will the City of Tucker accept UV CIPP with this bid? If so, what are the thickness requirements? The thickness requirements for each location and pipe size are called out in the unit price cost proposal form. 4 Does the City require a stamped PE design for the liners to ensure proper thickness? No. 5 Will the city accept water cured CIPP, if so, does the processed water need to be discharged into the Sanitary Sewer? 6 Does the city require test samples of each shot of CIPP? Yes. The City will allow water cured CIPP. The water from the cured CIPP must be discharged into the sanitary sewer system. The contractor will be responsible for contacting DeKalb County Water and Sewer to coordinate the amount of water to be discharged and the point of discharge. No. 7 Will the city accept spincast on segments larger than 30”? Yes. 8 Will the ITB be submitted electronically to this email: procurement@tuckerga.gov no later than February 20, 2025, at 1:00 pm. Will the Owner please confirm the overall budget for this project? Yes. Bids are required to be received by procurement no later than 1:00pm on 02/20/25. Will the Owner provide the anticipated NTP date for this project? The award is expected to be approved by the City Council on March 10, 2025 (tentative). The NTP could be issued in the month of April pending successful receipt of required 9 10 No. The City does not disclose project budgets during the solicitation process. 2 ITB 2025-001 ADDENDUM #1 11 The current ITB document does not include any technical specifications. Will those be provided via addendum? 12 The current scope of work includes cured in place pipe rehab (CIPP). Will the Owner please confirm the following for CIPP installation? a.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,515 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today