Bid you're unlocking
Install one, approximately 2,000 foot run of 4-20 mA cable loop from the level transmitter in the Lyman Spring Junction Box to the PLC control panel. Cable shall be direct-buried generally over the Ly
Bozeman, MT · Water & Sewer
Start your free trial and we'll take you straight to this bid — official source link included.
Already have an account? Sign in